Home Button
Contact

L&M Engineering (UK) Ltd.

info@lmeuk.co.uk

Mon – Fri: 8:00-17:00
Sat: 8:00-12:00

Services

Mechanical Engineering Electrical Engineering Welding & Fabrication Control & Automation Diesel Engine Services Engineering Stores

Marine Engines

Cummins Marine Engines Hyundai Marine Engines Solé Marine Engines

Company

News Projects About Us
L&M News
Research – Shore Power Transformers
The Research was provided with two brand new power transformers for constant onshore supply.
Steps taken:
  • Specification to customer requirements
  • Fabrication of skids
  • Electrical installation
The Research LK62 is one of Britain’s most advanced pelagic trawlers. Delivered in 2018 by Vard Langsten, the Skipsteknisk designed 80m vessel required a shore power connection solution to ensure the optimum upkeep while berthed in harbour. With the maximum shore supply available at 200A, the vessels switchboard is designed to be split and two supplies utilised. Two shore power isolating transformers were specced, supplied and installed. L&M fabricated the skids with forklift pockets and lifting attachments to allow the units to be transported easily. The units have input and output metering, as well as multiple voltage tappings, which are selectable by pushbutton control to adjust the voltage available at different locations to meet the ship’s requirements. It is intended that one of the units will accompany the vessel to all dry dock facilities.
Click images to enlarge
Updated: 02/12/2025

Share:

  • The Antarctic II pelagic trawler.
    Suggested Post

    Antarctic II – UMAS System Upgrade

  • The Corbie tied up.
    Suggested Post

    Greig Seafood – Corbie Rewire

  • Net drum with hoist rails overhead.
    Suggested Post

    LHD – Net Manufacturing Machinery

  • Cat 3508 propulsion engine.
    Suggested Post

    Alison Kay – Main Engine Replacement